IRIRONCLADROOFING + EXTERIORS
STORM LINE / 24 HOUR RESPONSE
(614) 555-0187Issue an estimate
SHEET A–02
ASSEMBLY SCHEDULE

SELECT AN
ASSEMBLY.

Pick the scope that is closest. The work order updates; an on-roof measurement still decides the final system and number.

We open to the deck, record sheathing repairs, install one specified water-management system, and close with attic and ground checks.

  • Deck photographed before cover
  • Ice barrier at eaves and valleys
  • New flashing—not sealant over old metal
RPL–01 / 2–4 DAYS

Active openings are made weather-tight first. The permanent scope follows photographs, measurements and a plain-language insurance review.

  • Emergency tarp from $250
  • Adjuster meeting documented
  • Deductible and exclusions named
STR–02 / 24 HR TRIAGE

Wall area, openings, water-resistive barrier and trim are measured as one exterior envelope—not priced as loose squares of siding.

  • Window flashing inspected
  • Manufacturer clearances followed
  • Waste factor shown in scope
SID–03 / 5–8 DAYS

We calculate roof area and discharge path, then size troughs and downspouts to move water away from the foundation.

  • 5″ and 6″ seamless systems
  • Outlet count shown on plan
  • Downspout route confirmed
GTR–04 / 1–2 DAYS
Enlarged architectural shingle specimen

DETAIL / WATER SHEDDING ASSEMBLY

The warranty is a system, not a shingle.

04 / FINISH03 / UNDERLAYMENT02 / ICE BARRIER01 / DECK
Manufacturer coverage applies to product. Ironclad’s 25-year workmanship warranty applies to our installation.

OWNER NOTES / BEFORE APPROVAL

Insurance. Permits. Warranty.

Do you work with insurance adjusters?

Yes. We provide measurements and photographs, meet the adjuster when scheduled, and explain the approved scope. Coverage decisions remain with the carrier.

Who pulls the permit?

Ironclad pulls required roofing permits and adds the fee to the written scope before approval.

What does 25 years cover?

Installation workmanship. Product warranties remain with the manufacturer and are registered at closeout.

Foreman inspecting roof work
CLOSEOUT / FOREMAN DALCA / 07.19.26
READY FOR FIELD MEASURE

Issue the next revision.

IRONCLAD / FIELD SETWO–4471ISSUE R–03 · 07/19/26
Scope
Roof replacement
System
Tear-off / full assembly
Window
2–4 DAYS
Estimator
L. Mercer
Phone
614 555 0187
OWNER REVIEWISSUED FOR ESTIMATE
Open estimate sheet